Installation of new transformers from 11kV up to 400kV can be installed as turn-key projects or stand-alone installations. Relocation of transformers between substations or sites can also be carried out with full road movement management and refurbishment on re-location. Re-location and installation of transformers within existing facilities, including the removal of redundant plant can also be carried out as a turn-key project.
At Bright Engineering, we specialize in High Tension (H.T.) and Low Tension (L.T.) cable laying and jointing services. With meticulous attention to detail and expertise in the latest industry techniques, we ensure seamless installation and reliable connections for both H.T. and L.T. electrical systems. Our skilled team utilizes advanced equipment and adheres to strict safety protocols to deliver exceptional results, whether it's laying underground cables for industrial complexes or jointing overhead lines for residential properties. Trust Bright Engineering for efficient, durable, and high-quality cable laying and jointing solutions that power your projects with confidence.
Our robust high tension panels are manufactured to withstand all weather conditions. Blue Volt’s range offer CPRI tested HT & LT panels rated 11kv & above. HT panels are typically used for power loads above 63KVA and LT panels applications are rated at 415V
Technically, fault finding means testing the electrical equipment to determine whether it's working safely and correctly.
We can provide support for one-off callout or longer term maintenance contracts to cover both your LV & HV infrastructure.